How LNG Pricing Works: Shipping, Netback and Unit Conversion

LNG is the form that allows natural gas to move by ship between markets without a direct pipeline. Cooling gas to about minus 260 degrees Fahrenheit turns it into a liquid occupying roughly one six-hundredth of its gaseous volume. That physical change enables marine trade, but a difference between feed-gas and destination LNG prices is not automatically profit. Gas procurement, treatment, liquefaction, terminal capacity, shipping, boil-off, canals, ports, regasification, pipeline delivery, currency and contractual rights all intervene. This guide maps each physical layer to its price basis, aligns tonnes, cubic metres, MMBtu and gigajoules, and uses netback as a reproducible comparison rather than a promise of project return.

Who this guide is for: Readers analysing LNG cargo prices, shipping, liquefaction projects, import terminals or the relationship between seaborne LNG and regional gas hubs

Key points to understand first

ONE CARGO, SIX LAYERS

Move backward from destination value to see the netback

  1. 01
    Feed gas and treatment

    Wellhead or hub purchase, pipeline and removal of water, CO2 and impurities

  2. 02
    Liquefaction

    Cooling energy, plant fuel, toll, capacity, outage and shrinkage

  3. 03
    Storage and loading

    Tank, berth, port, loading window and quality measurement

  4. 04
    Marine transport

    Charter, fuel, distance, speed, canal, boil-off and voyage days

  5. 05
    Unloading and regasification

    Terminal slot, storage, vaporisation and send-out capacity

  6. 06
    Destination gas

    Pipeline specification, hub basis, demand period and final currency

Quantity basis, ownership, capacity, loss and currency can change at every layer. Do not hide all differences inside one shipping-cost line.
DIRECT ANSWER

An LNG price represents a chain that makes gas movable by sea

LNG is a chain that cools natural gas into liquid, transports it in a specialised ship and turns it back into gas at an import terminal. Before liquefaction, treatment removes water, carbon dioxide, sulfur compounds and other components as required by the facility specification. Refrigeration cycles consume energy, tanks hold the LNG and loading systems transfer it to the vessel. At destination, unloading, storage, vaporisation and any required conditioning precede pipeline send-out. A constraint at any one stage can prevent extra cargo production even when upstream gas is abundant.

The EIA describes LNG as natural gas cooled to approximately minus 260 degrees Fahrenheit, at which point the liquid occupies about one six-hundredth of the volume of gaseous natural gas. That compression in volume enables marine trade, but cooling, containment and regasification need costly assets and energy. LNG transport is therefore not a simple pipeline freight charge. It is a sequence of capacity reservations and operations extending across assets and time.

PRICE BASIS

FOB and delivered prices place the commercial boundary in different locations

Before comparing two LNG prices, identify where title or risk transfers, who arranges the vessel and which delivery window must be met. An FOB basis commonly places the price around the loading terminal and can leave shipping with the buyer. A delivered basis commonly places transport to the discharge port with the seller. Those labels are not a substitute for the contract. Read the delivery point, title transfer, quality, quantity tolerance, demurrage and diversion provisions before assigning any cost or risk.

Pricing formulae also differ. A contract may refer to a gas hub, an oil-indexed formula, a fixed component, slope, lag, floor, ceiling, destination adjustment or spot assessment. A long-term contract and a prompt cargo assessment differ in period, volume commitment and flexibility even when both display a number for the same month. Preserve the applicable pricing month, averaging window, currency, heat basis and delivery terms as well as the benchmark label.

Checks required before comparing LNG price bases
ItemQuestionEffect on valueEvidence to retain
Delivery pointLoading port, discharge port or terminal outlet?Scope of shipping and regasificationContract clause or methodology
Pricing periodWhich month, average and lag?Timing and seasonalityFormula and calendar
Quantity basisTonne, cubic metre LNG or MMBtu?Conversion and lossQuality certificate
FlexibilityDiversion, cancellation or tolerance?Option value and costContractual rights
CurrencyWhich currency for price and costs?Foreign-exchange exposureRate source and timestamp

Do not infer the complete transfer of risk in an individual contract from an FOB or delivered abbreviation alone.

VOYAGE ECONOMICS

Shipping depends on distance, time, fuel and loss as well as freight

Voyage cost can include vessel charter or ownership, fuel, ports, canals, insurance, loading and unloading time, and a ballast leg. An unchanged daily charter rate does not create the same cost per cargo when distance, speed, canal queues, weather and port congestion differ. The vessel’s return or repositioning route also affects a commercial decision, so a one-way map distance is not a complete shipping model.

LNG in a cryogenic tank is not perfectly static; some becomes boil-off gas. Vessel designs may consume that gas as fuel, reliquefy it or manage it through another permitted system, so cargo loss and fuel accounting vary by ship, voyage and contract. Do not subtract a universal boil-off percentage. Compare loaded and unloaded energy, voyage days, heel, vessel specification and measurement basis. The value effect of the same physical loss also grows when cargo prices rise.

Separate delivered quantity from voyage expenseSimple delivered energy = loaded energy × (1 − verified voyage loss rate)Shipping cost per delivered unit = total voyage-related cost ÷ delivered energyBroader time cost = charter + fuel + ports/canals + loss value + financing and other stated itemsLoss and voyage-cost assumptions vary by vessel, contract, route, speed, season and fuel treatment. Use cargo-specific evidence.
NETBACK BRIDGE

Subtract costs on one quantity basis to build a netback

A netback starts with value at a sale point and subtracts the disclosed costs and losses required to reach that point, producing an implied value upstream. For example, subtract shipping, regasification, terminal charges and loss value from a delivered LNG price, all expressed per delivered MMBtu. To compare the result with feed gas, also put liquefaction toll, plant fuel and upstream pipeline charges on that same basis.

A simplified LNG netbackDestination net value = delivered price − shipping − regasification/terminal − destination feesFeed-gas netback = destination net value − liquefaction/toll − upstream pipeline − shrinkage valueNetback margin proxy = delivered cargo value − all explicitly included chain costsStandardise every line to the same currency and delivered energy unit. Without fixed cost, contractual rights, tax, financing and hedges, the result is not project return.

The calculator below subtracts only two broad cost buckets from a destination price. A working model should split them into auditable lines. It should also distinguish a short-run dispatch decision, in which a committed capacity payment may be sunk, from full-cycle economics for a new project. A positive prompt-cargo netback cannot establish that a multi-year liquefaction investment earns its required return.

UNIT DISCIPLINE

Bridge tonnes, cubic metres, MMBtu and GJ without a hidden constant

One LNG cargo may be described in metric tonnes, cubic metres of liquid LNG, standard cubic metres of gas, MMBtu or gigajoules. A tonne measures mass; a cubic metre of LNG measures liquid volume; a standard cubic metre of gas measures gaseous volume at defined conditions; and MMBtu or GJ measures energy. Mass-to-liquid-volume needs density, while physical quantity-to-energy needs gross or net calorific value. Both depend on composition, temperature or convention, so the cargo certificate should take precedence over a generic web average.

Separate fixed unit conversions from quality-dependent factors. The SI relationship of one kilowatthour to 3.6 megajoules is fixed. The MMBtu contained in one tonne of LNG or the Btu in one cubic foot of gas is not universal. US notation also commonly uses M for thousand and MM for million, making one MMBtu one million Btu. Confusing M, MM, Mcf and MMcf can introduce a thousand-fold error, so preserve the source notation exactly.

A unit bridge for LNG analysis
ExpressionQuantity typeRequired factorMain check
Metric tonne LNGMassCargo density and calorific valueComposition and certificate
m³ LNGLiquid volumeDensityTemperature and measurement basis
Standard m³ gasGas volumeExpansion, standard conditions and heatTemperature, pressure and composition
MMBtu or GJEnergyFixed energy conversion or heat contentGross versus net basis
Currency / MMBtuEnergy priceForeign exchange and quantity basisPrice period and side

Store the source, as-of date, quality basis and unrounded conversion factor on every conversion line.

RESEARCH ROADMAP

Audit one cargo through six reproducible steps

An LNG model should separate raw cargo information from assumptions. First fix loading terminal, receiving terminal, loading and delivery windows, ship, route, quantity, quality, price formula and currency. Only then enter capacity, cost, loss and elapsed time for each stage. When comparing prices, normalise them to the same delivery basis and energy unit. Match the foreign-exchange observation or average to the pricing period and retain its source.

  1. Define the cargo

    Retain origin, destination, windows, quantity, quality and delivery terms.

  2. Fix the energy basis

    Record gross or net heat, density, standard conditions and conversion source.

  3. Build to liquefaction

    Separate feed gas, pipeline, treatment, plant fuel, toll and capacity.

  4. Build the voyage

    Separate vessel, distance, days, charter, fuel, ports, canals and boil-off.

  5. Build the receiving side

    Check unloading, storage, regasification, send-out, hub basis and tax.

  6. Stress the netback

    Vary price, FX, voyage time, loss and outage, and write the update rule.

The exchange-rate drivers guide provides the currency layer. If LNG or gas is observed through a financial product, separately verify the reference and settlement with the CFD contract-specification guide. Use Macro Research Workbench to align hub, currency and published observations by date, then Financial Templates Hub to retain cargo assumptions, conversion certificates, routes and revisions. That trail lets a new reviewer reproduce the calculation rather than inheriting an unexplained spreadsheet constant.

MINI CALCULATOR

Simplified LNG netback margin

Subtract upstream and liquefaction costs plus shipping and regasification costs from one destination price, all per MMBtu.

Simple netback residual?currency / MMBtu
Residual / destination price?%

Fictional educational calculation. It does not fully capture quantity basis, loss, capacity payments, fixed costs, tax, hedges, financing, demurrage, credit or contractual options, and it is not profit, project return or proof of arbitrage.

Frequently asked questions

Is LNG a different fuel from natural gas?

LNG is natural gas cooled into liquid form for transport and storage, then regasified for pipeline delivery. Cargo composition and heat content still vary and must meet receiving specifications.

Is destination LNG price minus feed-gas price the profit?

No. Treatment, pipeline, liquefaction, plant fuel, shipping, boil-off, ports, regasification, reserved capacity, currency and tax require adjustment on one quantity basis, and fixed costs or capital return may still be absent.

How many MMBtu are in one tonne of LNG?

There is no universal factor. It depends on composition, gross or net calorific value and density. Use the cargo quality certificate or the conversion agreed by the contractual parties.

Can an FOB price be compared directly with a delivered price?

Not without adjustment. Their delivery point and allocation of shipping, loss, port expense and risk can differ. Align currency, energy unit and period, then read the specific title and risk-transfer terms.

Primary sources and verification links

  1. U.S. EIA | Liquefied natural gas explainedLiquefaction temperature, volume reduction, transport, storage and regasification
  2. FERC | Liquefied Natural GasPrimary US regulatory information for LNG terminals and reviews
  3. U.S. EIA | Energy conversion calculatorsConversions among Btu, joules, kilowatthours and other energy units
  4. U.S. EIA | Natural gas unitsCubic feet, Mcf, MMcf, Btu, MMBtu and heat-content context
  5. NIST | SI conversion factors for energyAuthoritative SI factors for energy and work

Edited and published by: SG Group · Editorial approach: We prioritize primary materials from the EIA, IEA, OPEC, exchanges, system operators and regulators, while separating physical quantities, delivery points, contract units and publication dates. Statistics, rules and contract specifications can change, so verify current information at the linked source and with your provider before acting.

Important notice: This article provides general education about energy markets. It is not investment advice, a product recommendation, a trading signal or a price forecast. Figures, contracts and calculations are fictional learning examples. Physical quality, delivery point, contract multiplier, expiry, margin, fees, tax, currency, regulation and trading hours vary by instrument, venue, provider, jurisdiction and date. Verify current exchange specifications, regulator and statistical-agency publications, and your provider’s terms before making a trading or business decision.